PROJECT DETAILS
Duration
8-Weeks
Location
Frenchay, Bristol
Value
£2m
Expertise
Principal Contractor
Sector
Education
The University of the West of England (UWE) is a major university based in Bristol, with its Frenchay Campus providing a vibrant environment for teaching, learning and student life.
The campus includes a substantial accommodation estate, providing students with bedrooms, ensuite facilities, kitchens and communal spaces. As part of its ongoing investment in the campus, UWE continues to modernise these facilities to provide contemporary, practical and welcoming places for students to live.
Client Requirements
As part of UWE’s programme of investment, we were appointed to refurbish Brecon Court II and Quantock Court VI, with a combined project value of £2 million. With only eight weeks available during the summer break, both six-storey blocks needed to be completed within the same programme and ready for students returning for the new academic year.
The refurbishment was designed to improve the quality, appearance and functionality of the accommodation, while introducing improved accessibility and durable finishes suited to busy student living.
How we Helped
The programme was fast-tracked to an eight-week summer window, with both Brecon Court II and Quantock Court VI completed ahead of students returning for the new academic year. Careful planning and a staggered programme across both blocks allowed multiple work areas and trades to progress simultaneously, maintaining momentum without compromising the quality of the finished accommodation.
Our teams upgraded 140 ensuite shower rooms plus 140 bedrooms, alongside 24 communal kitchens, including three being accessible, electrical upgrades and the redecoration of hallways and all communal areas. Redecoration and replacement floor coverings were also completed throughout both properties, covering every room.

One of 24 communal kitchens complete with double ovens and hobs
The ensuite refurbishment include new floor vinyl, wall boarding, sanitary ware, showers, vanity units with illuminated mirrors, extract fans with PIR switching, redecoration and replacement fittings. A bespoke stainless-steel floor drain cover/grille was also designed and manufactured by our team to address defective existing floor drains. Rather than breaking up and excavating the existing floor, our design allowed the new cover/grille to connect directly to the existing drainage system. This avoided disruptive demolition works, reducing the time and cost associated with repairing the drains while maintaining the fast-track programme.
Work was sequenced to create a continuous flow between trades, with completed areas handed over promptly for the next stage. Maintaining this flow across both blocks allowed us to make full use of the limited summer programme, with each trade moving efficiently from one completed area to the next. This kept the works on schedule and enabled UWE’s deadline to be met, while maintaining a consistent, high-quality finish across all accommodation and communal areas.
The Outcome
The completed refurbishment provides students with a more modern, comfortable and welcoming environment, improving the quality of their day-to-day experience at the Frenchay Campus.
For UWE, the project supports a wider objective: maintaining an attractive, high-quality accommodation offer that contributes to the student experience and strengthens the long-term value of its estate. Modern, well-maintained accommodation helps UWE provide facilities that meet changing student expectations, while ensuring its existing accommodation continues to perform well for years to come. The result is more than a refreshed living environment; it is an investment in the quality, appeal and long-term performance of UWE’s student accommodation.

One of the many corridors fully refurbished
PROJECT DETAILS
Duration
8-Weeks Weeks
Location
Frenchay, Bristol
The University of the West of England (UWE) is a major university based in Bristol, with its Frenchay Campus providing a vibrant environment for teaching, learning and student life.
The campus includes a substantial accommodation estate, providing students with bedrooms, ensuite facilities, kitchens and communal spaces. As part of its ongoing investment in the campus, UWE continues to modernise these facilities to provide contemporary, practical and welcoming places for students to live.
What UWE Brecon Court 2 Wanted
As part of UWE’s programme of investment, we were appointed to refurbish Brecon Court II and Quantock Court VI, with a combined project value of £2 million. With only eight weeks available during the summer break, both six-storey blocks needed to be completed within the same programme and ready for students returning for the new academic year.
The refurbishment was designed to improve the quality, appearance and functionality of the accommodation, while introducing improved accessibility and durable finishes suited to busy student living.
How we Helped
The programme was fast-tracked to an eight-week summer window, with both Brecon Court II and Quantock Court VI completed ahead of students returning for the new academic year. Careful planning and a staggered programme across both blocks allowed multiple work areas and trades to progress simultaneously, maintaining momentum without compromising the quality of the finished accommodation.
Our teams upgraded 140 ensuite shower rooms plus 140 bedrooms, alongside 24 communal kitchens, including three being accessible, electrical upgrades and the redecoration of hallways and all communal areas. Redecoration and replacement floor coverings were also completed throughout both properties, covering every room.

One of 24 communal kitchens complete with double ovens and hobs
The ensuite refurbishment include new floor vinyl, wall boarding, sanitary ware, showers, vanity units with illuminated mirrors, extract fans with PIR switching, redecoration and replacement fittings. A bespoke stainless-steel floor drain cover/grille was also designed and manufactured by our team to address defective existing floor drains. Rather than breaking up and excavating the existing floor, our design allowed the new cover/grille to connect directly to the existing drainage system. This avoided disruptive demolition works, reducing the time and cost associated with repairing the drains while maintaining the fast-track programme.
Work was sequenced to create a continuous flow between trades, with completed areas handed over promptly for the next stage. Maintaining this flow across both blocks allowed us to make full use of the limited summer programme, with each trade moving efficiently from one completed area to the next. This kept the works on schedule and enabled UWE’s deadline to be met, while maintaining a consistent, high-quality finish across all accommodation and communal areas.
The Outcome
The completed refurbishment provides students with a more modern, comfortable and welcoming environment, improving the quality of their day-to-day experience at the Frenchay Campus.
For UWE, the project supports a wider objective: maintaining an attractive, high-quality accommodation offer that contributes to the student experience and strengthens the long-term value of its estate. Modern, well-maintained accommodation helps UWE provide facilities that meet changing student expectations, while ensuring its existing accommodation continues to perform well for years to come. The result is more than a refreshed living environment; it is an investment in the quality, appeal and long-term performance of UWE’s student accommodation.